35. To ensure monitoring of the project, the promoter must establish a project monitoring plan, which must(1) specify the methods used to collect and record the data required for all the monitoring parameters in Appendix D, and specify the frequency of data acquisition;
(2) specify(a) the maintenance, cleaning and inspection frequency specified by the manufacturer;
(b) the frequency of the maintenance, cleaning and inspection of the equipment used for the project;
(c) the frequency of the verification of measurement instrument accuracy and calibration, in accordance with subdivision 2 of this Division; and
(d) the methods used to replace missing data, if applicable, in accordance with subdivision 3 of Division II of this Chapter;
(3) specify the role of the person responsible for each monitoring activity and the quality assurance and quality control measures taken to ensure that data acquisition and the verification of measurement instrument accuracy and calibration are carried out consistently, precisely and in accordance with this Chapter; and
(4) include a template for the maintenance logs for project components.